Road improvement work done on multiple Marion streets
Oct 19, 2026
MARION — The town repaired crack sealing on several roads between Oct. 19 and Oct. 21.
A crack seal is a minimally disruptive surface treatment designed to prevent deterioration of a street. It includes applying a mixture of asphalt cement and reinforcing fibers over cracks in pavement.
The road improvements were done on Benson Brook Road, Parlowtown Road, Holmes Road, Water Street, Ryders Lane, Pleasant Street, South Street, School Street, Ridgewood Lane, Giffords Corner Road, Abels Way, Joanne Drive, Jenna Drive and Evergreen Cemetery Roadway.
Standard Post











